Dedicated behind-the-meter generation — 50 to 500 MW — designed, financed, built, owned, and operated by Atlas. Energized in 9 to 14 months, not years.
Concept renderingAI campuses, server manufacturers, and reshored industry are queuing years for utility interconnection — while finished facilities sit dark. Every month without power is unrealized revenue.
One partner across the full power lifecycle — so your capital, your people, and your attention stay on your business.
Mobile generation arrives onsite in weeks. Construction, commissioning, and early operations begin immediately — no waiting on the queue.
A dedicated behind-the-meter facility — 50 to 500 MW of high-efficiency natural gas generation — engineered, financed, and built by Atlas.
Atlas owns and operates the system under multi-year power purchase agreements, with 24/7 monitoring and field service.
Backed by ~1.4 GW of reserved Caterpillar generation equipment through 2030, against an identified opportunity set of roughly 4 GW.
A 5-year agreement — with two 5-year extension options — signed with an investment-grade technology infrastructure customer. Bridge power onsite since March 2026; full energization targeted for the first half of 2027, with ~$50–55M of annualized adjusted free cash flow expected at full operation.
Roughly $840M of generation equipment reserved through 2030 — securing the scarcest input in the power market before it tightened, and guaranteeing delivery schedules customers can plan around.
A $220M acquisition bringing five decades of distributed natural-gas generation experience — hundreds of units running in remote, harsh environments long before "behind the meter" was a headline.
Wherever the queue is the bottleneck — compute, manufacturing, industry — Atlas brings the plant to the load.
Concept renderingA power assessment maps your capacity needs, site, fuel access, and schedule against the Atlas deployment pipeline.